OPS 571 Final Exam

Are you optimistic about Online Learning? Then find your answer at Studentehelp regarding your all course OPS 571 Final Exam, UOP OPS 571 Final Exam, OPS 571 Final Exam question and answer.

1. Which of the following is considered a major process flow structure?

Lead TimeFabricationLean ManufacturingProject

2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?

Certification is sought by any firm assuming they pay annual dues.2nd Party – where a customer audits its supplier3rd Party – where a qualified national or international standards/certifying agency serves as an auditor1st Party – where a firm audits itself against ISO standards

3. Which of the following is ISO 14000 primarily concerned with?

Quality managementTime managementContinuous improvement managementEnvironmental management

4. Which is the one correct value stream principle?

Look for efficiencies in the factory, office, physical, procedural, and technical operations.Eliminate waste that stops, slows down, or diverts the value stream.Concentrate on speeding up value-adding operations rather than removing waste. Keep the value stream moving at minimum velocity.

5. What is the starting point in developing a capacity plan for a health care operation?

Determining the effective capacity over timeEstimating design capacityForecasting patient demand for a reasonable length of timeDiscovery of the bottleneck operation

6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?

MRP (Material Requirements Plan)ERP (Enterprise Resource Planning)MPS (Master Production Schedule)WBS (Work Breakdown Structure)

7. Which of the following is an element that addresses elimination of waste under lean production?

Kanban production control systemProduction ahead of demandMinimized run timesGroup plant loading technology

8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?

Level elementsFuture elementsPast elementsCyclical elements

9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:

Reducing product quality during the assembly processDesigning products so they can be manufactured by a virtual factoryReducing equipment in the production processSimplification of the product by reducing the number of separate parts

10. Which of the following is one of the principles of reengineering?

Quality at the sourceDo not select suppliers on the basis of price alone.Have those who use the output of a process perform the process.Leverage high cost employees with lower cost employees.

11. Which of the following is a characteristic that can be used to guide the design of service systems?

Services are all similar.Services businesses are inherently entrepreneurial.Quality work means quality service.Services cannot be inventoried.

You've reached the end of published parts.

⏰ Last updated: Nov 02, 2016 ⏰

Add this story to your Library to get notified about new parts!

OPS 571 Final Exam with Quiz Through UOP at StudentehelpWhere stories live. Discover now