GMG Tech Engineering Ltd Project

12 0 0
                                    

1. Conception and Study of a Green Brickyard intended for the arid zone:

Analyses & Studies:

History, Market research, ground, manufacturing processes, necessary equipment, power consumptions and economic survey.

Technological integrations and Substitutions of the processes:

It’s mainly to substitute the drying and cooking by using innovative technologies. The goal is to design a green brickyard, independent, modern and without Co2 emissions.

2. Project “4 VELE”

It is a vertical city project “City Life”. The project is composed of all elements necessary for the daily life of a person, a passenger, a tourist and so on. Indeed it is a multifunctional complex comprising housing, employment, tourism, business, sport and relaxation.

We mention that this project has obtained an Agreement of financing of “300Million€” following the development of a Business plan.

3. The Sweet almond oil

It is about the transformation of an agricultural farm of 2600 ha into:

- A field of almond tree on a surface of 2000Ha in order to produce the sweet almond oil.

- A biological agricultural farm of 600 ha.

- Unit oil production

The work is conceptual, technical, technological and economically focused on Biological agriculture, water, energy, processing industry. An action plan complete and coherent was established.

You've reached the end of published parts.

⏰ Last updated: May 03, 2014 ⏰

Add this story to your Library to get notified about new parts!

GMG Tech Engineering Ltd ProjectWhere stories live. Discover now