Wbs Stories

Refine by tag:
wbs
wbs

9 Stories

  • Wolf Black Soul by nmagwspaya
    nmagwspaya
    • WpView
      Reads 503
    • WpPart
      Parts 8
    Transmigrasi? " I'll be your boyfriend " Future perfect
  • Bacon Chronicles by Bacon_fam
    Bacon_fam
    • WpView
      Reads 15
    • WpPart
      Parts 2
    Long....long.... ago......there was a- Flip that, ok, let's cut this short, welcome to the book about the bacons, a group of weirdos who have a connection with bacons. I shall tell you the story of how the bacons were made. Hope you enjoy. WARNING!! There might be some curse words.....
  • How To Integrate Scope, Schedule, Budget & Risks - WJ, W & S Viljoen by sannetteviljoen
    sannetteviljoen
    • WpView
      Reads 5
    • WpPart
      Parts 1
    Why Integrate the Scope, Schedule, Budget and Risks? (1) The three most fundamental project control questions are answered more accurately: (1.a) What is the monetary value of the work planned? (1.b) What is the monetary value of the work earned? (1.c) What are the actual costs for the work accomplished? NOTE - The answers are available during each reporting period.(2) To test the realism of the performance measurement baseline/S-curve.(3) The code of accounts is established at the lowest level of the integrated work breakdown structure. (4) Enables the team to conduct more accurate integrated baseline reviews. (5) Enables the project's integrated performance measurement baseline.(6) Assess progress, measure technical and cost performance more accurately. (7) Delivers more accurate cost/schedule performance indexes. (8) Successful solution for team members working in silos.
  • Simplified Integrated Project Controls - WJ Viljoen, S Viljoen & W Viljoen by sannetteviljoen
    sannetteviljoen
    • WpView
      Reads 7
    • WpPart
      Parts 1
    The book, Simplified Integrated Project Controls, provides clear guidelines on "how" to manage Project Controls based on Earned Value Management Principles. Accredited by ECSA, the Engineering Council of South Africa, the aim of this methodology is to give the reader the necessary understanding and knowledge of how to set up a simple project, as well as a multi-discipline complex project correctly, which is one of the main reasons for project control failure. It has been found that the methodology in this book, if applied correctly, enhances the performance of most of the project management and control software on the market. The book describes the guidelines for all the necessary Earned Value Management processes, complete with guidelines for integrated baseline reviews, detailed scheduling, cost, as well as dashboard reporting. It also clarifies how to assess progress, measure performance, and to establish the true status of a project, and how to manage engineering, procurement, and construction (EPC) risks at control account level from the very early phases of the project. This book enables the reader to provide answers to the three most fundamental project control questions of project controls, at each reporting cycle: • What is the monetary value of the work planned? • What is the monetary value of the work earned? • What are the actual costs of the work accomplished? In Summary, this book provides the "how to...": • Base projects on an Integrated Work Breakdown Structure. • Identify all the Control Accounts that will ensure the success of the project objectives. • Test the authenticity of a Master Schedule based on the IWBS's Control Accounts. • Develop and agree on a Performance Measurement Baseline, i.e. time-phased S-curves. • Conduct Integrated Baseline Reviews. • Objectively and accurately measure Project Performance (technical and progress performance). • Manage thresholds. • Deliver Progress, Performance, and Status Reports.
  • Bound by The Alpha's Mark by ImpressionEase
    ImpressionEase
    • WpView
      Reads 21
    • WpPart
      Parts 2
    In a world where supernatural creatures live in secrecy, an alpha werewolf and a human journalist are brought together by a series of inexplicable events. As they investigate a string of supernatural occurrences, they discover a connection that defies logic. Their partnership turns passionate, but the werewolf's powerful pack and a dangerous secret society threaten to tear them apart.
  • Why uPVC Windows Are the Perfect Choice for Your Home by wbsbuildingsolutions
    wbsbuildingsolutions
    • WpView
      Reads 2
    • WpPart
      Parts 1
    When it comes to selecting the right windows for your home, uPVC windows have become increasingly popular due to their unmatched benefits. Known for their durability, energy efficiency, and low maintenance, uPVC windows can elevate your home's aesthetic appeal while providing practical advantages. In this blog, we will explore why uPVC windows are an ideal option for homeowners looking to enhance both the functionality and beauty of their living spaces.
  • One Integrated Work Breakdown Structure by WJ Viljoen, S Viljoen & W Viljoen by sannetteviljoen
    sannetteviljoen
    • WpView
      Reads 8
    • WpPart
      Parts 1
    "How To" Integrate a Project's Scope, Schedule, Budget and Risks into "One Integrated Work Breakdown Structure". Accredited methodology and aligned with PMBOK, PMSA, PMI, NEC, FIDIC, AACEI, CPM, SACPCMP