Construction lift
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
Ongoing, First published Apr 28, 2021
https://www.micnodrive.com/applications/construction-lift.html


The entire electrical system consists of PLC, KE200 inverter, energy feedback unit, main drive motor, reducer, inverter reactor, transformers, handles, etc, control of elevator stop, up and down, fast, release the brake and various protection, so as to realize the stable operation of elevator efficient, safe, and will feedback to the grid generated when the elevator down the renewable energy, to achieve better energy-saving effect.
All Rights Reserved
Sign up to add Construction lift to your library and receive updates
or
#20overflow
Content Guidelines
You may also like
Slide 1 of 1
Brittanie's Writer Room cover

Brittanie's Writer Room

15 parts Ongoing

A place for all things Brittanie!