https://www.aipucompressor.com/
1. The design and installation meeting the requirements
(a) Natural gas compressors should be arranged in the open air or in shed;
(b) Ventilation measures should be taken on the top of the natural gas compressor shed or enclosed workshop;
(c) The floor slab of the natural gas compressor workshop should be partially made of grates;
(d) A combustible gas alarm device should be installed in the compressor workshop;
(e) The compressor equipment foundation and base should be solid and complete;
(f) The anchor bolts and the connecting bolts of each part should be fully buckled, neat and fastened;
(g) The grounding resistance of the equipment should be less than 10 Ω.Todos os Direitos Reservados