Wastewater and Electricity Sector Operators
  • Reads 2
  • Votes 0
  • Parts 1
  • Time <5 mins
  • Reads 2
  • Votes 0
  • Parts 1
  • Time <5 mins
Ongoing, First published Jul 13, 2023
Abu Dhabi Department of Energy (DoE) has issued the Second Regulatory Control for water, wastewater and electricity sector operators, which sets the revenue limit at AED 50 billion for January 2023 to December 2026, to ensure operator efficiency and strengthen regulatory framework.
All Rights Reserved
Sign up to add Wastewater and Electricity Sector Operators to your library and receive updates
or
#342dhabi
Content Guidelines
You may also like
You may also like
Slide 1 of 10
The Heir and the General cover
The Heartbroken Heartbreaker cover
Lorem_Ipsum_Wp Take 14 cover
The Mystery Fighter cover
The Hidden Shadow cover
Holy Sinners (Sinners 2) cover
Saving Elliot ✓ cover
The Mystery Fighter II cover
DARK MOON: THE BLOOD ALTAR cover
Dark Tides (Kingdom of Bones #2) cover

The Heir and the General

52 parts Complete

Forced into an engagement with a man she doesn't love, Reyna must ignore her bond with her father's general in order to avoid a war and save her throne. ***** As the first female heir to one of the great Northern Kingdoms, Reyna panics when her claim to the throne is threatened by the discovery that her father's general is her soulbound partner. She forces herself to ignore their connection, determined to be more than a general's wife, only for her father to manipulate her into a political engagement with a man she could never love. So to forge her own path forward, keep her throne, and confront her feelings for the general who owns her heart, Reyna must find a way to refuse this arranged marriage without destroying her kingdom in the process. [[word count: 100,000-150,000 words]] ---------- Cover designed by Ren Tachibana