BY WORKING WITH THE OPERATOR, H&P REDUCED THE AVERAGE CURVE TIME BY 3 HOURS
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
Ongoing, First published Aug 22, 2023
H&P aims to treat every customer relationship as a true partnership, which is why our Directional Team approached the operator with a bold plan to pause AutoSlide technology for the curve section of the hole where the "ceiling" seemed to exist. Their idea was to drill some of the curves manually to gain new perspective on what could be hindering optimal performance so that they could help the operator achieve their desired outcome.
All Rights Reserved
Sign up to add BY WORKING WITH THE OPERATOR, H&P REDUCED THE AVERAGE CURVE TIME BY 3 HOURS to your library and receive updates
or
#14drillingrigcontractor
Content Guidelines
You may also like
Slide 1 of 1
Lorem_Ipsum_Wp Take 14 cover

Lorem_Ipsum_Wp Take 14

3 parts Ongoing

Just another test story