Early-on, drilling consistency was established and time savings were quickly identified across the wells, with a 22% (0.6-day) average on-bottom rotating drilling time improvement. The customer saw a ROP increase of 5% in the intermediate section and 26% improvement in the lateral - all contributing to a 12% lower cycle time and an average cost savings $42,000 at a $70,000 spread rate.
Learn more about the case study here: https://helmerichpayne.com/resources/case-studies/texas-operator-sees-an-average-savings-of-42-000-at-70-000-spread-rate or contact us to know in detail: https://www.helmerichpayne.com/contact.