APPLICATION OF PURPOSE BUILT RIG TECHNOLOGY RESULTS IN STEP CHANGE IN DRILLING
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
Ongoing, First published Dec 18, 2023
This paper will be presented by E.S. Kolstad at the 2007 SPE/IADC Drilling Conference held in Amsterdam, The Netherlands, 20-22 February 2007. Read and download the tech paper from here: https://www.helmerichpayne.com/resources/technical-publications/application-of-purpose-built-rig-technology-results-in-step-change-in-drilling-time-cost-and-opportunities or you can contact us here: https://www.helmerichpayne.com/contact.
All Rights Reserved
Sign up to add APPLICATION OF PURPOSE BUILT RIG TECHNOLOGY RESULTS IN STEP CHANGE IN DRILLING to your library and receive updates
or
#9drillingrigcontractoroilandgas
Content Guidelines
You may also like
You may also like
Slide 1 of 10
ဒဿလို မိန်းမပျို  cover
The Green Flame cover
𝗣𝗨𝗥𝗦𝗨𝗜𝗧 cover
𝒯𝒽𝑒𝒾𝓇 𝓁𝑜𝓃𝑔 𝓁𝑜𝓈𝓉 𝓅𝓇𝒾𝓃𝒸𝑒𝓈𝓈 cover
six vs one cover
You Have Us... Always. cover
Tensura: The Abyss Demon cover
♡ បណ្តូលចិត្តរេរ៉ាវែល ♡ cover
Homelander: New Legacy cover
ဖတ်စေချင်ရုံသက်သက်ပါ cover

ဒဿလို မိန်းမပျို

61 parts Ongoing

စဝ်ခွန်နောင်= မင်းလူသတ်ရင် ကိုယ်ကအလောင်းဖျောက်ပေးမယ့်မဲ့ကောင်ပါ baby Gumkino =ကျွန်မက ပန်းကိုင်ရတာထပ် gunကိုင်ရတာပိုသဘောကျတဲ့မိန်းကလေးတစ်ယောက်မို့ ရှင့်အတွက်အဆင်ပြေပါ့မလား