Huasun Commences Construction of 5GW High-Efficiency HJT Project in Hefei
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
  • Reads 1
  • Votes 0
  • Parts 1
  • Time <5 mins
Ongoing, First published Jun 13
https://www.huasunsolar.com/c-i-solar/

On June 6th, the groundbreaking ceremony for Huasun's 5GW high-efficiency heterojunction (HJT) cell and module production project based in Hefei took place in Feixi County. Covering a sprawling 68 acres area with a total investment of approximately 0.7 billion dollars, this strategic initiative is poised to revolutionize the HJT industry.
All Rights Reserved
Sign up to add Huasun Commences Construction of 5GW High-Efficiency HJT Project in Hefei to your library and receive updates
or
#938roof
Content Guidelines
You may also like
You may also like
Slide 1 of 10
𝐓𝐡𝐞 𝐔𝐧𝐛𝐫𝐞𝐚𝐤𝐚𝐛𝐥𝐞 𝐁𝐨𝐧𝐝 cover
WOSO Oneshot cover
No Going Back cover
Short Novel cover
Alessia Russo Oneshot cover
မောင့်ထိဂရုံး!Horror! cover
jk smut Twoshots cover
🔞ហឹរ 2+3នាទី🥵🔥 cover
The Life of Amelia Potter (WTM) cover
Indian short stories cover

𝐓𝐡𝐞 𝐔𝐧𝐛𝐫𝐞𝐚𝐤𝐚𝐛𝐥𝐞 𝐁𝐨𝐧𝐝

38 parts Ongoing

A story of four brothers whose life revolves around each other. Fate wasn't kind to them, but they were in it together, always have been and always will be. The eldest brother who is known to be a cold, arrogant and emotionless CEO can destroy the world for his younger brothers. Dare look at his brothers with any ill intention and he won't think twice before destroying the lives of those individuals. He has been a father figure to his brothers since the death of their parents in a car crash. When it comes to them he is a total softy and looks after their every need, but this doesn't mean that he won't discipline them if they are in the wrong. Will these brothers be able to maintain the unbreakable bond they have? When some secrets are revealed of the younger brother, will the trust remain the same between them? What has fate planned for them? Peep into the story of these brothers to know further about their lives...... 🫣