1. Which of the following is considered a major process flow structure?
· Lead Time
· Fabrication
· Lean Manufacturing
· Project
2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
· Certification is sought by any firm assuming they pay annual dues.
· 2nd Party – where a customer audits its supplier
· 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor
· 1st Party – where a firm audits itself against ISO standards
Find the final exam answers here
3. Which of the following is ISO 14000 primarily concerned with?
· Quality management
· Time management
· Continuous improvement management
· Environmental management
4. Which is the one correct value stream principle?
· Look for efficiencies in the factory, office, physical, procedural, and technical operations.
· Eliminate waste that stops, slows down, or diverts the value stream.
· Concentrate on speeding up value-adding operations rather than removing waste.
· Keeps the value stream moving at minimum velocity.
Final Exam Answers just a click away
5. What is the starting point in developing a capacity plan for a health care operation?
· Determining the effective capacity over time
· Estimating design capacity
· Forecasting patient demand for a reasonable length of time
· Discovery of the bottleneck operation
6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?
· MRP (Material Requirements Plan)
· ERP (Enterprise Resource Planning)
· MPS (Master Production Schedule)
· WBS (Work Breakdown Structure)
Click here and download
7. Which of the following is an element that addresses elimination of waste under lean production?
· Kanban production control system
· Production ahead of demand
· Minimized run times
· Group plant loading technology
8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?