chapter 7 snow

56 2 0
                                    

( intro)

it has been a week now sins Kieron returned to the railway and in that time  he and the other had been working hard  pulling trains all along the line 

that was not all  with all the extra work Angelise had   brot new engines in to help they where Ivor the engine thow his class is unknown he a hard working tank engines that not all there where also 2 twin  tender engines that are L&YR Class 28 mix traffic engines called Apps and Dark then there a The GWR 5700 Class  of 0-6-0 pannier tank steam locomotive, built by the Great Western Railway and this this engine is Sarah

that was not all  with all the extra work Angelise had   brot new engines in to help they where Ivor the engine thow his class is unknown he a hard working tank engines that not all there where also 2 twin  tender engines that are L&YR Class 28 mi...

Oops! This image does not follow our content guidelines. To continue publishing, please remove it or upload a different image.

Oops! This image does not follow our content guidelines. To continue publishing, please remove it or upload a different image.

sins the railway been made brand new all the engines had different jobs now  

Oops! This image does not follow our content guidelines. To continue publishing, please remove it or upload a different image.

sins the railway been made brand new all the engines had different jobs now  

Kieron kept up with the Express but some time took goods train and all to as Kieron Shared his Express with Shadow

Jonson, Dark and Apps help with the goods  taking trains of cargo and trucks all over the railway  to where they need to go

Lily and Ivor ran one of the branch lines 

Colin act as a shunter in the yard shunting trains  for the other engines   at the main Station 

Winstion  and Adam   took normal Passenger trains and help with the goods work to and Sarah helps to but she also a mix traffic engine 

the fairy tail railway ( clossed)Where stories live. Discover now