Breakdown is dead...

476 13 6
                                        

This is Knockout's reaction to Dreadwing telling him Breakdown isn't coming back

Oops! This image does not follow our content guidelines. To continue publishing, please remove it or upload a different image.

This is Knockout's reaction to Dreadwing telling him Breakdown isn't coming back. This makes me so sad when I think about this since I ship Knockout and Breakdown together.

I had to trace over a drawing because I can't draw Knockout to save my life XD. Drawing is not mine but I colored and edited it.

My Artwork Stories to obsess over. Discover now