Chapter 21 : Parpaldia in verge of collapse

538 21 0
                                    

The next day 5th October 1945 (2605 koki), 1639 Central Calender, the outskirt of the industrial City of Durmo, near Netherland-Parpladia current border

General Simon Hendrik Spoon of current Chief of Staff of Royal Netherlands Army or KL (Koninklijke Landmatch) and the former Chief of Staff of KNIL (Koninklijk Nederlands Indisch Leger) was now standing in the front of City Wall of Durmo. When he was seen the City Wall of Dunno, he was remembering for same City Wall in the 18th into 19th century European City Planning with military purpose. This was bringing back some sense of nostalgia in Spoon mind and also steeling his mind to conquer this territory for Netherlands because he saw this place as European Continent and with this Netherlands finally can do some territorial expation that she cannot do in Old Earth because Netherlands Territory was surrounded by Great Power like Great Britain, France, and Germany.

According to the some source of trusted local information that he get from the local population, the place with this 18th century city wall and have such Napoleonic aura around this place was The Industrial City of Durmo, the central Ames production center of Parpaldia Army in the western region according to the same source of information and was located 50 to 60 KM from the nearest . In this Netherlands Expansionary Corps consisted of 5 Division with each division consist of 13.000 soldier each. With this power and also after knowing that this city was also connected to the port city 20 km from the outskirt of the city, General Spoon has already ordered the occupation of the port city with full power of one division with a task to help the Navy to re-branding the port city into fitting standard of minimal of commercial port in Netherlands that can accommodate at least 20 liberty class ship at the same time. Another important task was to secure and maintain public order around this city port of Niew Rotterdam (A new name that was given for this city port and was became official since Netherlands Army set it's food in the city soil).

With this city port in the hand of the Netherlands, now Netherlands place their own deep water port for military power projection in the sea. With this new city, Royal Netherlands Navy (KM: Koninklijke Marine) the entire Navy forward base operation. The Navy ship that was for this forward base operation was Two De Zeven Provinciën Class Light Cruiser that just completed one week ago, just in time for the invasion with sea worthiness test will be implemented in the same time the ship was used for sea operation, and also the Government was now planning to build 6 more of this ship on this class and 6 of the proposed Ansterdam Heavy Cruiser Class based on the design of De Zeven Provinciën but armed with main gun of 203 mm cannon instead 152 mm caliber cannon that was used in the De Zeven Provinciën and all this ship must be used and ready in two years and all of this planned and added ship was planned to be build in the major shipyard of Belgium and Netherlands.

Together with this new naval rearmed program that was started with the new project of building a new, modern Light and Heavy Cruiser with suit the Netherlands need in the moment, Netherlands was also strive to build 3 more Aircraft Carrier with the same specifications of HNLMS Karel Doorman this ship must be finished in max 3 years, starting right in the same time that the shipyard also begun to construct the cruiser in the same major Netherlands and Belgium shipyard who also producing Light and Heavy Cruiser. Also a major rearmed program of the navy was was to completed the Holland class Destroyer that was 2 of the 6 planned ship was cancelled because the the fund that was not enough to completely funding the whole 6 ship and also building the more 10 ship of Holland class Destroyer that bringing a total of 16 ship of this class. Also the planned Friesland class Destroyer that was planned to be build 8 ship in total was now planned to be added with 6 such ship of the same class and was planned to be completed in 3 years max for all of this newly added ship and the ship that was already in the construction stage.

Tenno Heika BanzaiWhere stories live. Discover now